MIL-DTL-17667E
6.2 Acquisition requirements. Acquisition documents should specify the following:
a. Title, number, and date of this specification.
b. Type of material (see 1.2).
c. When first article inspection is required (see 3.1).
d. If material should be furnished in rolls or flat cuts, and the required size of each (see 3.3).
e. Basis weight of material (see 3.4).
f. Packaging requirements (see 5.1).
6.3 First article test samples. Samples for first article inspection should consist of a sample
of the wrapping material which has been produced by the contractor using the same production
process, procedures, and equipment that is going to be used in fulfilling the contract.
6.4 Conformance inspection lot. For purposes of sampling, an inspection lot for
examinations and tests should consist of all material made by the same process from the same
components by one manufacturer and submitted for delivery at one time.
6.5 Reclaimed fiber. Reclaimed fiber is fiber collected from solid waste, or from waste
collected as a result of an agricultural or manufacturing process, but not including material
generated from and reused within the plant as a part of its own papermaking process. The
papermaking process is the manufacturing process of producing paper up to and including the
cutting and trimming of the machine reel into smaller rolls or rough sheets.
6.6 Subject term (key word) listing.
Corrosion protection
Packaging
Preservation
6.7 Changes from previous issue. Marginal notations are not used in this revision to identify
changes with respect to the previous issue due to the extent of the changes.
9