C. Workmanship. The film shall be free of any imperfections or foreign matter that may detract from its appearance or interfere with its utility.
3. QUALITY ASSURANCE:
A. Responsibility for Inspection. The contractor is responsible for the performance of all inspection requirements as specified herein. The contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure that supplies and services conform to prescribed requirements.
Testing is required to be performed at the beginning of the contract, or whenever there is a change in manufacturing process or materials. Certificates of compliance are acceptable for the duration of the contract only after the initial testing has been completed and all requirements have been met.
Suppliers are encouraged to use quality control (QC) techniques that exhibit control over their processes, e.g. (Statistical Process Control SPC techniques), as defined in American National Standards Institute (ANSI) Z1.1, Z1.2, Z1.3/ American Society for Quality Control (ASQC) B.1, B.2, B.3 that systematically reduce excess variations. (Objective evidence shall be available that demonstrates overall measurement adequacy techniques and controls. These techniques shall ensure quality levels equal to, or greater than, those cited in applicable technical document or, herein.
End item inspection/testing may be used by the offeror or the Government representative, as a means to determine the effectiveness of the in process quality controls. In process controls shall not be substituted for end item performance testing.
For those characteristics for which there are no such controls, or for end item performance test, lot by lot sampling for inspection/ test shall be required. Sampling shall be in accordance with (ANSI) / (ASQC) Z1.4. An inspection lot shall consist of all like items submitted for inspection at one time. The inspection level shall be S-2 with an AQL of 2.5 Per Hundred Units (PHU) for dimensions, workmanship, physical properties and cling test, with sample unit of 5574 cm2 (6 ft2).
The supplier must provide objective evidence (tests and inspection records) that the presented material meets the requirements of the sampling plan as indicated above.
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business